Projects

Veneto Villas, Dubai

The Veneto Development comprised of luxury villas and townhouses divided primarily into 2 zones – the East and the West.

Scope

  • Engineering Design Review
  • Value Engineering
  • Construction Supervision

READ MORE

National Housing Scheme, Brunei Darulsalam

The project consists of 4000 units (2400 units Terrace House and 1600 semi detached) including associated infrastructure works. HSS have been appointed to coordinate and manage the project on behalf of the Brunei Economic Development Board.

Scope

  • Engineering Design Review
  • Project Control Management
  • Project Management

READ MORE

Bukit Raja Integrated Township

“DOORWAY TO A NEW WORLD IN KLANG” is Bandar Bukit Raja’s tagline. This mega self-contained township covering an area of 1762 acres (Stage 1) located in Klang, is a freehold township comprising of residential, commercial and industrial units.

Scope:

  • Soil Investigation
  • Design of Civil and Infrastructure Works
  • Tender Documentation/Contractual Matters
  • Construction Management

READ MORE

AL Reem Island Bridge

This project entails the construction of the connecting bridge between Abu Dhabi and associated road works and the relocation of utilities, permanent filling and embankment, substructure, service reservations, drainage, lighting, signage, pavement, irrigation and landscaping. CHSS mandate included the engineering design, Preparation of NOCs and their approvals as well as project management.

Scope

  • Concept and Detailed Engineering Design
  • Obtaining NOC’s from Various Authorities
  • Project Management

READ MORE

Lagoon Bridges for Dubai Parks

There are five (5) multi-span bridges connecting the east-west sides of the 1.2 km long Lagoon and a Water Wheel Pool that form part of the project located within Dubai Parks Themed Entertainment Resort.

Scope

  • Detailed Engineering Design
  • Tender Documentation
  • Construction Supervision

READ MORE

Saadiyat Island Service Tunnel

The 1.2 km long open cut service tunnel is located in the Cultural District on Saadiyat Island.  The service tunnel extends from east to south, serving the Guggenheim, Louvre, Zayed National Museums.

Scope

  • Concept Design
  • Preliminary Design
  • Detailed Engineering Design
  • Construction Supervision

READ MORE

Upgrading of the Federal Street Lighting System with Sustainable System

Conservation of energy is an essential part of the vision and goals of Ministry of Infrastructure Development (MOID). CHSS carried out the Feasibility Study for the development and upgrading of the existing street lighting system to one of the optimum lighting systems. In addition, CHSS was responsible for the preparatory work and documentation required for PPP projects,, such as legal arrangements, Procurement guidelines, EOI, RFQ, RFP.

Scope

  • Feasibility Study
  • Prequalification of Contractors/Suppliers/Service Providers/Developers
  • Preparation of Tender Documents
  • Tender Analysis
  • Contracts Documents
  • Post Tender Services

READ MORE

Dibba Khorfakkan Ring Road

CHSS provided engineering services, detailed design and construction supervision to the e Dibba-Khorfakkan Ring Road that runs runs through a 900m tunnel linking Al Aqah and Sharm in Dibba, in the Northern Emirates of the UAE.

Scope

  • Preliminary Engineering
  • Detailed Engineering Design
  • Construction Supervision

READ MORE

Roundabout 7 and 13

Traffic congestion within the Jebel Ali Port deteriorated tremendously in the recent past, One of the often grid locked area is in the stretch from roundabout No.7 and No.13.. As such, JAFZA has decided to undertake the road widening and expansion works in the area to alleviate the situation.

Scope

  • Design and Build
  • Authority Approvals
  • Construction Supervision

READ MORE

Pavement Failure Investigation

3.0km of 17.km has shown severe Pavement Failure. MOID appointed CHSS was commissioned to study the cause of the failure and provide solutions.

Scope

  • Engineering Review
  • Engineering Solution and Specifications
  • Implementation Process

READ MORE